A
manufacturer of passive fire protection coatings has doubled the
storage capacity of its site by investing in its second temporary
building from Spaciotempo.
Promat
UK, based in Lindrick, near Worksop, Nottinghamshire, has avoided the
expense of relocating or storing its products off-site by using a
300sqm temporary building from our Neivalu range as a temporary
warehouse.
Promat’s
products are sprayed onto the walls of tunnels, petrochemical plants
and other industrial buildings to protect the infrastructure of the
facility. They have been working at full capacity over the past two
years to meet growing demand.
However,
the extra production has meant it has run out of room to store its
products, which two years ago led the company’s factory manager,
Matt Green, to ask us to help.
Within
a couple of months – with planning permission secured thanks to our
town planning specialist partners - we had erected a 300sqm temporary
building on Promat’s site.
Then,
at the end of last year, with demand continuing to soar, Promat
ordered another building – which we erected within a matter of
weeks.
Standing
on a concrete base, it has one set of roller doors and a single
personnel door. It has a thermo insulated roof – consisting of an
inflated PVC envelope – and 40mm steel sandwich wall panels.
Both
temporary buildings, which are on long-term hire, are currently full,
each containing 350 pallets of bagged products awaiting delivery.
Matt
said: “Because we own the premises, have a settled and flexible
workforce and excellent transport links, we want to stay where we
are, which is why the temporary buildings have been so useful.
“They
are full to capacity now, but there is no way we could have met the
demand without the extra storage space they gave us.”
Scott
Jameson, director of sales at Spaciotempo, said: “Success for any
company is always good news, but often it cause problems with
warehousing if they are producing more goods than they can store.
“However,
the fact that Promat had spare land on their site was a saving grace.
It meant that we could erect two temporary buildings which have been
crucial to ensuring that they can deal with the extra demand.”
Visit
us online to find out more.
No comments:
Post a Comment