Our temporary
warehousing offers a practical and efficient solution for your business as you
look for relief or expansion. Our service includes planning, installation and
maintenance as we will look to get your warehousing up and running as soon as
possible, so your business isn't effected due to minimum downtime. Find out
more by visiting our warehousing page.
Showing posts with label temporary warehouse buildings. Show all posts
Showing posts with label temporary warehouse buildings. Show all posts
Wednesday, 25 September 2013
Tuesday, 13 August 2013
Temporary Warehousing
Here at Spaciotempo, our temporary
buildings are widely used throughout the industry as temporary warehouses. Our
team of experts will work alongside you to establish the right specification
for the job and can also provide a planning service if it is required. On top
of that the ability to erect a temporary building on-site has allowed many
companies to capitalise on seasonal demand and business opportunities for a
pre-determined period of time. If you would like to find out more about our
temporary warehousing, then please visit our website or call us on 01889
569 569.
Friday, 17 May 2013
Promat UK Ltd meets hot demand with a second temporary building
A
manufacturer of passive fire protection coatings has doubled the
storage capacity of its site by investing in its second temporary
building from Spaciotempo.
Promat
UK, based in Lindrick, near Worksop, Nottinghamshire, has avoided the
expense of relocating or storing its products off-site by using a
300sqm temporary building from our Neivalu range as a temporary
warehouse.
Promat’s
products are sprayed onto the walls of tunnels, petrochemical plants
and other industrial buildings to protect the infrastructure of the
facility. They have been working at full capacity over the past two
years to meet growing demand.
However,
the extra production has meant it has run out of room to store its
products, which two years ago led the company’s factory manager,
Matt Green, to ask us to help.
Within
a couple of months – with planning permission secured thanks to our
town planning specialist partners - we had erected a 300sqm temporary
building on Promat’s site.
Then,
at the end of last year, with demand continuing to soar, Promat
ordered another building – which we erected within a matter of
weeks.
Standing
on a concrete base, it has one set of roller doors and a single
personnel door. It has a thermo insulated roof – consisting of an
inflated PVC envelope – and 40mm steel sandwich wall panels.
Both
temporary buildings, which are on long-term hire, are currently full,
each containing 350 pallets of bagged products awaiting delivery.
Matt
said: “Because we own the premises, have a settled and flexible
workforce and excellent transport links, we want to stay where we
are, which is why the temporary buildings have been so useful.
“They
are full to capacity now, but there is no way we could have met the
demand without the extra storage space they gave us.”
Scott
Jameson, director of sales at Spaciotempo, said: “Success for any
company is always good news, but often it cause problems with
warehousing if they are producing more goods than they can store.
“However,
the fact that Promat had spare land on their site was a saving grace.
It meant that we could erect two temporary buildings which have been
crucial to ensuring that they can deal with the extra demand.”
Visit
us online to find out more.
Thursday, 20 September 2012
Burton brewers Marston’s raises a glass to Spaciotempo

With
sales for its own-label ale on the up, at the end of last year
brewers Marston’s found that it was running out of storage space at
its brewery in the UK’s beer capital, Burton-on-Trent.
This
was despite Marston’s, which keeps drinkers refreshed with
favourites such as Marston’s Pedigree, Old Empire IPA and Burton
Bitter, having already invested in a temporary building from Spaciotempo two years earlier.
The
acquisition of the first building, which measured 396sqm and six
metres high, gave the brewery storage space for 2,000 pallets –
which equated to around two million pints of beer.
As
2011 drew to a close, and with demand increasing, the company opted
for an extension measuring 686sqm. This increased its storage
capacity by a further 3,000 pallets – containing a thirst-quenching
three million pints of beer.
Yet
this was only part of the story, because since the conditions its
beer is stored at is vital, Marston’s needed a warehouse that would
hold a steady temperature, no matter what the weather was doing
outside.
To
accommodate this, Spaciotempo supplied a building from its Neivalu
range, complete with single-sheet steel cladding and a thermo roof, a
PVC polyester envelope inflated with a low-pressure automatic pump to
create a pocket of air, which acts as a layer of insulation.
“Sales
of our beers were doing extremely well and we had just got a new
distribution contract, so in the run-up to Christmas we realised that
we needed extra storage space to cope with all that extra volume,”
explained Emma Gilleland, head brewer at Marston’s.
“We
already had a building from Spaciotempo and it was working perfectly,
so we went straight back to them.
Scott
Jameson, director of sales at Spaciotempo, said: “Marston’s is a
huge name in the brewing and pub industry, so naturally we are
delighted to have supplied another building to such a well-known and
well-regarded brand.
“While
the dimensions of the extension are impressive, the thermo roof is
proving to be the real success story of the contract.
“It
is yet another demonstration of how modern temporary buildings
perform as well as permanent structures and even can be trusted to
keep literally millions of pints of the nation’s favourite beers in
optimum condition.”
Subscribe to:
Posts (Atom)