Friday, 15 March 2013

Spaciotempo’s temporary building helps Vinci to get on track in Nottingham


Engineers building a multi-million pound extension to Nottingham’s tram system now have somewhere to store construction equipment and materials after investing in one of our temporary buildings.

Vinci Construction has purchased a 600sqm single-skin Neivalu temporary building in order to house lengths of track and the metalwork used to hold the overhead cables - as well as provide office space – while the company builds the 17.5km line, which is set to be completed towards the end of next year.

The temporary building measures 90m from gable to gable and although the original plan was to erect in a flat, level site, a change of plan saw it located on a site that rose very slightly at one end.

Such an elevation, although minimal, would require extensive groundwork to accommodate a similar sized permanent structure, but it caused no significant problems for us when erecting the temporary structure and Vinci was able to move into its new facility in under two weeks.

Scott Jameson, director of sales at Spaciotempo, said: “By purchasing the building, Vinci will enjoy the flexibility of having a purpose-built facility that can be moved around the site to meet future needs, or can be dismantled and erected elsewhere.

“The Neivalu is a quality building that is more than capable of meeting Vinci’s needs in Nottingham over the next few years and for many years afterwards.”

Friday, 1 March 2013

Exhibiting at the IMHX

Just to remind all of our followers, we are exhibiting at the upcoming IMHX at the NEC in Birmingham. There will be over 20,000 logistics professionals together in one place so make sure you come and pay us a visit at stand number 18M190. Find out more at - http://www.imhx.biz/exhibitors/view/IMHX2167/182

Friday, 15 February 2013

Spaciotempo’s temporary buildings help RSRL to decommission historic Harwell

Hundreds of bags of material arising from demolition work at a site that once played a key part in the development of Britain’s atomic energy programme are being safely kept in dry storage in two temporary buildings that we have supplied. The temporary buildings, which provide 1,975sqm of space and have steel cladding walls and single skin PVC roofs, have been installed to aid the decommissioning and demolition process at the former Harwell research facility, near Didcot in Oxfordshire. Read more at - http://www.pressbox.co.uk/detailed/Business/_Spaciotempo_s_temporary_buildings_help_RSRL_to_decommission_historic_Harwell__1092925.html

Friday, 8 February 2013

Logistics MD set to help Spaciotempo UK present its case at IMHX 2013


The managing director of a logistics firm which invested in a temporary building in order to win a contract with a potential value of £1m will take to the stage at the forthcoming IMHX 2013 exhibition to explain how they can enable companies to expand their businesses.

Fiona Strong, who runs Ark-H, in Wilstead, Bedfordshire, will talk about how securing the extra capacity quickly helped her company; when we present a paper during a case study conference being held at IMHX's Logistics case study theatre on Day Four of the exhibition, which takes place at the NEC from March 19.

Ark-H invested in one of our temporary buildings last year after reaching the capacity of its 12,000sqm storage facility in autumn. Erected in just nine days on a spare patch of land at the firm's HQ, the 1,000sqm building gave Ark-H space for 650 pallets, allowing it to take on a lucrative contract to store vital festive marketing material for a new client. Read more at - http://www.spaciotempo.co.uk/latest-news

Friday, 1 February 2013

Could Your Business Be Affected By Severe Weather?


A temporary building from Spaciotempo could provide your business with the perfect solution in a crisis.

  • Quickly installed to meet the sudden requirement for additional storage or production space
  • Provides stability and strength in adverse weather conditions
  • Perfect for retail, industrial, sport and education
  • Available to hire or buy, with a 24 hour response line for emergencies

Contact our sales team today:
Spaciotempo UK Ltd
T : 0845 485 0910 | sales@spaciotempo.co.uk

Visit our website for more information www.spaciotempo.co.uk/emergency